Subway Metro Station Excavation - Results Monitored with SiteMaster!
SiteMaster is used to analyze inclinometer data from 33m excavation for a subway station excavation in Europe. The unique capabilities of SiteMaster allowed the presentation of data through a construction timeline that identified issues with obtained results.
SIteMaster allowed the plotting of inclinometer data on plan where maximum displacements, while the contractor was able to apply corrections and plot displacement against construction progress.
Sample cumulative inclinometer displacements for metro subway station in Europe are displayed below: